Summary
The authors consider the impact of the predictions on the tradeoff between the number of preemptions and the minimization of the sum of (weighted) completion times in different machine settings: single machine, unrelated machines and malleable job scheduling. They propose online algorithms that leverage uncertain predictions in order to offer good tradeoffs. Their methods cleaverly build upon classical algorithms of the scheduling litterature and are evaluated analytically as well as with numerical experiments.
Strengths and weaknesses
Strengths
This is the first paper that uses predictions for studying the tradeoff between preemptions and average completion times. The paper is clearly written, the objectives and the results, both the theoretical ones and the numerical experiments, are clearly stated. This paper will certainly lead to further research in the field of learning-augmented-algorithms for scheduling.
Weaknesses
The main weakness of the paper is that the number of preemptions depends on the number of overestimated jobs.
Questions
Is there any hope to improve the results in the case where the number of overestimated jobs is large or are there any lower bounds?
Limitations
yes
Paper formatting concerns
No
Final justification
Thank you for your responses. I maintain my positive score.
We thank the reviewer for their insightful question, which helped us refine a theorem on the lower bound.
Q. Is there any hope to improve the results in the case where the number of overestimated jobs is large or are there any lower bounds? We appreciate the reviewer’s insightful question. Unfortunately, a substantial dependence on g, the number of overestimated jobs, is unavoidable. Although it is not explicit (it assumes g=Θ(n)), Theorem A.3 can be readily adapted to show that a O(1)-competitiveness requires Ω(g) preemptions, even on a single machine. Formally, we can extend Theorem A.3 to show that any O(1)-competitive algorithm requires at least Ω(g(1+log(pmax/g))). So in particular if g≤pmax, our guarantee for overestimated jobs (sketched in Section 2) is tight up to constants and the dependence of ε.
Proof sketch: We will include this extension in the final version. The proof considers g identical jobs with a common large prediction and partitions the execution into geometrically increasing time intervals. If the algorithm makes o(g) preemptions during one interval, it can process only o(g) distinct jobs there. We then truncate each job’s processing time just beyond the processing it has received by the end of the interval. This instance is indistinguishable to the algorithm up to that point, so all g jobs remain unfinished, whereas an optimum schedule is cheap because all but o(g) jobs have total processing volume bounded by the preceding scale. Hence constant competitiveness forces Ω(g) preemptions in each of Θ(1+log(pmax/g)) disjoint scales, which implies the stated bound.
To get around this curse of overestimated jobs, we can intentionally underestimate the job sizes with a high confidence, as discussed in “Handling Overestimation” in Section 1.1.