Strengths:
- On significance and impact. The paper addresses online energy-efficient scheduling, a critical challenge given rising energy costs and the fact that energy consumption has become a primary bottleneck for modern data centers.
- The paper introduces a new important scenario for energy-efficient scheduling with predictions. Indeed, investigating a learning-augmented setting is highly appropriate for scheduling, where jobs naturally arrive over time and are not known in advance. Critically, predicting a single, piecewise-constant scalar (the optimal offline speed) is a far more practical and robust task than attempting to forecast exact individual job characteristics.
- On quality and significance. The authors introduce novel online algorithms backed by rigorous proofs for consistency, robustness, and smoothness. These properties are essential for understanding how the algorithms will behave under diverse real-world workloads, ranging from highly predictable traffic (e.g., massive, multiplexed job streams) to volatile environments (e.g., small batches of heterogeneous jobs).
- The paper also provides results on the PAC-learnability of machine speed predictions.
- Beyond the core theoretical results, the paper provides experimental evaluations using both synthetic and real-world traces, demonstrating the practical efficacy of the proposed algorithms in realistic scenarios.
Weaknesses:
-
(On clarity and quality) Overall, the manuscript's readability could be significantly improved.
- First, On Framing and Motivation:
- I have a few concerns regarding how the overall narrative of the paper is framed.First, the title starts with “Speed prediction,” yet the paper does not actually propose or evaluate methods for predicting speed. Instead, it focuses on job scheduling strategies given the accuracy of an existing speed prediction. I strongly recommend revising the title to more accurately reflect the true scope of the work, for instance, focusing on "scheduling with speed predictions."
- Second, I wonder if the chosen prediction objective (specifically, the speed profile generated by an optimal offline algorithm with perfect foresight) is the most natural choice for this context. As the authors rightly point out, predicting exact job attributes (release times, deadlines, and workloads) is highly complex. Why not reframe the work around predicting the global workload intensity at time t instead of predicting individual jobs? There is a direct, intuitive relationship between the volume of work required and the speed at which a scheduling algorithm should run. Framing the problem this way feels more natural and would likely provide a cleaner, more compelling narrative.
- Second, there is a number of exact definitions missing
- p3 line 100: What is σ(t)? See the Comment on the definition of σ(t) below.
- Is the time considered discrete or continuous? Integrals definition hints towards a continuous variable, however, what does ∀t≥0 in Algo 1 means for a continuous variable? I guess it is something like for all release dates t?
- Some incorrect, ambiguous or unprecise statements
- p3 l112: “By the convexity of (1), the cost is minimized when each job runs at a constant speed.” This statement is ambiguous. I can think of many optimum solutions in which jobs do not run at constant speed. See the Comment on convexity and constant speed below
- p3 121: “it is always optimal … to select the job with the earliest deadline (EDF)”. EDF is optimal if the considered scheduling allows for free preemption, has underloaded work, and independent jobs. It would be good to give precision for such a statement, with a reference as well. As an example, you never discuss that you are considering scheduling with preemption (it has to be guessed from your problem definition).
- It is always good to add a simple instance as an example to be sure that the problem is well understood by the reader (especially with an unlimited appendix)
- It would have been appreciable to present quickly your baselines, especially when they are short to describe, e.g. OA, at least in the Appendix. It helps the reader to have self-contained content. Similarly, giving an example of an algorithm for ONLINE when introduced would be appreciable to help the reader understand the problem and your solution well.
-
On experiments. Regarding the experiments and fairness of comparison with baselines. In the results for real instances, TPE shows the same performance as OA, which does not use any predictions. This occurs because the prediction method used (previous-day prediction) cannot provide the exact precision that TPE requires. While requiring perfect precision is a known limitation of the TPE algorithm, evaluating it in an environment where it cannot succeed makes the comparison unfair. The authors should explicitly state that when exact jobs cannot be predicted, TPE essentially reverts to OA.Moreover, TPE-S would have been a much more appropriate baseline for this setting. As defined in the original paper, TPE-S allows for a tolerance threshold on the predictions of rj, dj, and wj. Given the inherently low prediction accuracy of this specific setting, TPE-S is a far more adequate baseline to evaluate.
Comment on the definition of σ(t).
p3 line 100: What is σ(t)? It is defined as the job selected at time t for processing. However, several jobs can be processed at the same time. Similarly, the following definitions implies that a job could be processed, then stopped, then processed again. Is σ(t)=j, when j starts to be executed the first time? What happens if several jobs start to be executed at time t?
Comment on convexity and constant speed.
p3 l112: “By the convexity of (1), the cost is minimized when each job runs at a constant speed.”
This statement is ambiguous. I can think of many optimum solutions in which jobs do not run at constant speed. The convexity of the cost gives that the speed of the machine should somehow be constant between arrival time and deadlines.
Consider the following simple instance with 2 jobs
j_1 with r_1=0, d_1=4 et w_1=2
j_2 with r_2=1, d_2=3 et w_2=2
The optimum solution is that the machine runs at a constant speed s(t)=1 with:
when t \in [0,1] s_1(t) = 1
when t \in [1,3] s_1(t) = 0 et s_2(t) = 1
when t \in [3,4] s_1(t) = 1
In this solution, jobs do not run at constant speed.
Additional comments.
Section 2. What is the range of s(t)? [0,∞]?
l121: “given the machine speeds” -> “given the machine speed”
p4 l168: Where is defined ONLINE? If the algorithm is an arbitrary algorithm, why not give one as an example?
p4 l171: How do you compute the set Σ of all schedules?
We thank the reviewer for the positive assessment and for the constructive suggestions on presentation, which we agree will strengthen the paper. We address each point below.
1. Separating the offline and dynamic prediction models (Section 4 and Appendix B.2).
We agree that the paper can make clearer which model each result concerns, and we will make the following concrete changes to the presentation of the paper.
First, we will add the summary table below near the start of Section 2, so the reader sees all three models and their guarantees in one place before the technical sections.
For the two models with smoothness results, consistency follows from smoothness. The table also makes clear that the dynamic machine speed model is handled by Algorithm 1 (Section 3), giving consistency and robustness, whereas the offline machine speed and dynamic job speed models are both handled by Algorithm 4 (Section 4), giving smoothness and robustness. We will define the three prediction models formally in one place in Section 2 so that their names and differences are clear before the technical sections.
Second, we will present the two models handled by Algorithm 4 separately: the offline machine speed result (Theorem 4.1) and the dynamic job speed result (Theorem B.7) will be stated as two separate results in the body, rather than how currently their main results and proofs are integrated in Appendix B (Theorems B.5-7). The two models will no longer be mixed within the same discussion.
Finally, at the start of Sections 3 and 4 and of each subsection, we will name the prediction model being treated and point to the corresponding row of the table.
2. On the PAC-learnability section (Section 5).
We acknowledge that our main PAC-learnability result applies only in a restricted setting. The goal of this section is to identify a natural regime in which speed predictions are provably strictly easier to learn than the job predictions considered in prior work. We believe that, together with the observation that speed predictions are always no harder to learn than job predictions, this result provides a theoretical argument for speed predictions from the perspective of learnability.
Regarding “more detailed empirical results showing the training and application of such predictions in a practical context,” our experiments focus on the application of speed predictions and not their training. We agree that designing an experimental framework for evaluating the training of different prediction types in learning-augmented algorithms is an interesting direction. Such a framework would be valuable not only for speed scaling but also for other problems that have been studied under multiple prediction models. One important question is how to evaluate prediction quality when the ultimate objective is performance on the downstream scheduling problem.
3. Intuition: why smoothness is harder in the dynamic machine speed model.
We thank the reviewer for their interest in this question. The key difficulty is that smoothness requires an online feasibility projection that stays close to the prediction. For offline machine-speed predictions, the entire predicted speed trajectory is available when constructing the projection. For dynamic job-speed predictions, each job arrives with its predicted level speed, which directly identifies how the prediction intends to process each job. In contrast, dynamic machine-speed predictions reveal only the aggregate machine speed at the current time. They do not reveal how this speed should be allocated among jobs or how future predicted speeds will evolve. Therefore, an online projection must make feasibility decisions with less information while still staying close to the predicted cost. Designing such a projection with a smoothness guarantee remains open.