- Rating
- 4
- Clarity
- 3
- Confidence
- 3
- Originality
- 3
- Quality
- 3
- Significance
- 3
Read review
Summary
This paper extends learning-augmented approximation guarantees beyond linear-objective selection problems to unrelated-machines makespan scheduling. The proposed algorithm uses predictions of heavy job assignments to reduce the workload of heavy-assignment search, while completing the remaining short jobs via standard LP rounding. The proposed algorithm provides (1+\varepsilon) approximation within polynomial time, and the algorithm remains capped by the classical 2OPT guarantee. Numerical experiments were provided to supplement the theoretical results.
Strengths and weaknesses
Strength: a. Algorithmic design. A key strength of the paper is its clean two-layer algorithmic design. The inner layer uses the classical LP-based rounding framework to complete the schedule once the heavy assignments are fixed, which is a natural and effective way to reuse the structure of existing R|C_{\max} approximation algorithms. The outer layer then enumerates relevant threshold values T, allowing the algorithm to mitigate the risk of unreliable prediction. b. Theoretical analysis. The paper gives explicit approximation guarantees that depend on false-positive and false-negative prediction errors. The formulation of (6) and (7) and using them in the proof looks like a non-trivial extension of the false-positive and false-negative error that was originally proposed for linear objectives. It is also nice to see the robustness result that the algorithm keeps the classical 2-approximation even when the prediction is highly unreliable.
Weakness: a. Weakness: dependence on unreliable predictions and many heavy jobs. One concern is that the complexity of the proposed method seems to still depend heavily on the prediction being sufficiently accurate. Classical heavy-job-search based algorithms are only polynomial-time under restrictive conditions, such as when the number of machines is small. In this paper, if the prediction is highly unreliable and the number of heavy jobs is large, then many heavy assignments may be missed by the prediction, and the search budget K required to recover them could also become large. In that regime, the localized search may again become computationally expensive, as the complexity of the inner layer increases exponentially with the search budget K. The paper does not seem to discuss this limitation sufficiently, especially regarding how the method behaves when both the prediction quality is poor, the number of machines is large, and the number of heavy jobs is large. b. Though the numerical experiments are a good supplement, taking the average of results over only 5 runs for each data point looks insufficient. I would recommend 20 runs or more.
Questions
As I mentioned in the weakness, I am curious about the complexity of the proposed algorithm when the prediction is highly unreliable, and the number of heavy jobs is large.
Limitations
The main limitation of the paper is the complexity of the proposed algorithm. Specifically, I think it can still only claim pseudo-polynomial when the problem instance is small (i.e., the number of heavy jobs is small), and the improvement regarding the algorithm complexity in such cases may be limited.
Paper formatting concerns
NA
Final justification
Happy to accept the paper.
We sincerely thank the reviewer for the careful reading and constructive feedback. We especially appreciate the positive assessment of our two-layer algorithmic design, prediction-dependent theoretical guarantees, and robustness against inaccurate predictions.
Weakness A & Question
We would like to clarify that K need not scale with the number of errors in the predicted heavy-assignment structure (as we noted in the Step 2 of the Algorithm section and the interpretation of Corollary 5.3). Rather, K is a user-chosen constant search/trust budget that controls how much computation is spent correcting the prediction. For every fixed K, the running time O((mn)Kpoly(m,n,logP,1/ε)) is polynomial, independently of the prediction quality and of the number of heavy assignments.
Missed heavy assignments that are not corrected within the budget K are properly handled by Steps 3 and 4 through the residual LP and rounding procedure. Their contribution is then controlled by the largest missed heavy assignment remaining after the K-budget search, ROPT,K−, and the makespan guarantee degrades smoothly with the magnitude of the prediction errors not covered by K. Even in the worst case, the guarantee never exceeds the factor 2, matching the best-known polynomial-time approximation guarantee for general R∣∣Cmax.
Therefore, even when the number of heavy assignments is large and the prediction is highly inaccurate, the algorithm remains applicable and retains the above smooth, 2-robust guarantee. In particular, even with K=0, our algorithm returns a feasible schedule, with the effect of missed heavy assignments entering the makespan guarantee smoothly and remaining capped at 2OPT (as we showed in Corollary 5.4). Increasing K is optional and only trades additional search for a smaller residual false-negative term.
The condition K≥∣MissOPT∣ in Corollary 5.3 is included to illustrate that, when the prediction is sufficiently accurate relative to the chosen budget K, the algorithm achieves a stronger makespan guarantee. It is not a requirement of the algorithm itself, which remains applicable and robust for any fixed K (as we noted in the interpretation of Corollary 5.3).
Limitation 1
We would also like to clarify that the running time is not pseudo-polynomial. As discussed above, K need not scale with either the number of heavy assignments or the inaccuracy of the prediction. Hence, our algorithm runs in polynomial time even when the number of heavy assignments is large and the prediction is highly inaccurate. In particular, our method is not restricted to instances with only a small number of heavy jobs. In this regime, accurate predictions yield a strong makespan guarantee, the guarantee degrades smoothly with the prediction error, and even arbitrarily inaccurate predictions never lead to a guarantee worse than the classical best-known 2-factor. Thus, the algorithm shows the desired consistency, smoothness, and robustness properties of a learning-augmented algorithm even for instances with many heavy jobs.
Weakness B
We have rerun the experiments using 30 independent random seeds. Although the standard-error bands in the original five-run results were already clearly separated for the relevant comparisons, increasing the number of runs further reduced the standard errors and yielded more stable estimates, while preserving the same qualitative conclusions. We will include the updated 30-run results in the final version of our paper.
We thank the reviewer again for these valuable comments. We hope that the discussion above addresses the concerns regarding the role of K and the polynomial-time behavior of our algorithm, particularly in the presence of many heavy assignments and inaccurate predictions. We will also include the updated 30-run experimental results in the final version of our paper.