- Rating
- 2
- Clarity
- 3
- Confidence
- 4
- Originality
- 3
- Quality
- 3
- Significance
- 2
Read review
Summary
Review of NeurIPS submission 24346
Summary
This paper investigates the effect of minibatching in stochastic gradient descent with heavy-ball/Nesterov momentum on convex quadratic problems satisfying the interpolation condition. The authors show that in the interpolation regime, both momentum schemes achieve an acceleration effect up to an error term that decays linearly in terms of the batch size. This linear speedup phenomenon is validated with experiments.
Strengths and weaknesses
Strength
This paper is well-written and technically solid. The authors did a good job motivating the problem and providing insights in the proof.
Weaknesses
Despite the technical contributions, I have some reservations about the problem setting and the comparison with existing results from the literature
-
Restrictive problem setting
The paper primarily focuses on the quadratic interpolation regime. Although quadratic problems enable powerful analysis tools like dynamical system formulation, it also imposes strong assumptions on the problem class and make the analysis hard to generalize.
-
Comparison with existing results
To my knowledge, several existing works have established accelerated rates of SGD (and stochastic proximal point) for general convex functions under the interpolation regime [1-3]. At least two of them [1, 2] have explicitly derived a convergence rate of type , where upperbounds and is the minibatch size (e.g., Theorem 1 of [1]). This result can be combined with a restart procedure to yield the same result as obtained in this paper.
Although this paper achieves an accelerated rate for heavy-ball momentum, it also heavily exploits the quadratic structure. Given the existing result in this regime, the contribution of this paper, in my opinion, is less clear.
Overall, I don't think the current results are sufficient for publication at NeurIPS.
Questions
Questions
-
In the experiments you use ridge regression. When , is the interpolation condition satisfied?
Besides, why does larger minibatch size need more iterations to converge for CD + NAG?
References
[1] Woodworth, B. E., & Srebro, N. (2021). An even more optimal stochastic optimization algorithm: minibatching and interpolation learning. Advances in neural information processing systems, 34, 7333-7345.
[2] Yuan, X. T., & Li, P. (2023). Sharper analysis for minibatch stochastic proximal point methods: Stability, smoothness, and deviation. Journal of Machine Learning Research, 24(270), 1-52.
[3] Vaswani, S., Bach, F., & Schmidt, M. (2019, April). Fast and faster convergence of sgd for over-parameterized models and an accelerated perceptron. In The 22nd international conference on artificial intelligence and statistics (pp. 1195-1204). PMLR.
Limitations
Yes.
Paper formatting concerns
N.A.
Final justification
The authors' rebuttal do not fully address my concerns regarding the strength of the result compared to [1]. I believe the paper should go through a round of major revision to clarify its positioning and don't think it's ready for publication at NeurIPS.
[1] Woodworth, B. E., & Srebro, N. (2021). An even more optimal stochastic optimization algorithm: minibatching and interpolation learning. Advances in neural information processing systems, 34, 7333-7345.
Thanks for all the feedback, questions, and references!
Problem setting. As pointed out by the AC, the quadratic interpolation setting is a foundational model for studying SGD and momentum dynamics, with countless prior works devoted to understanding that specific regime, e.g., see [1,5,27,30,34,53]. Arguably, the fact that our result resolves an open question even in such a classical and well-studied setting is a major strength of this work. That being said, we agree that extending our results beyond quadratics is an interesting direction for future work.
Comparison with existing results. Thanks for the references, we will carefully discuss them in the final version. As we explain in the paper (lines 48-49), there is extensive literature on developing intricate acceleration schemes for SGD that provide strong theoretical guarantees, but are very different from what is used in practice. Both Woodworth and Srebro (2021) as well as Yuan and Li (2023) fall into this category. In the former, the authors introduce a wrapper algorithm and an elaborate step-size/momentum schedule, while in the latter, they consider an entirely different stochastic proximal point method (the latter also do not provide linear convergence guarantees, so their results are largely incomparable with ours). Our aim is different. We seek to understand the standard SGD algorithm accelerated with classical HB/NAG momentum schemes, and using simple fixed parameter choices, which is very close to what is used in practice and yet has eluded a complete theoretical understanding. In Vaswani et al (2019), the authors have a similar aim to us, but unfortunately their analysis requires a spurious assumption called the strong growth condition, which may not be satisfied even in the simple instance of running accelerated coordinate descent on kernel ridge regression. They also require a dynamic parameter schedule, instead of the fixed parameters we consider.
Is the interpolation condition satisfied in our experiments? Yes. We consider the task of kernel ridge regression, which is equivalent to solving a linear system (K+λI)w=y. This linear system is consistent (i.e., has a solution) for any λ≥0, which ensures that the interpolation condition is satisfied.
Why CD+NAG needs more iterations for large mini-batches? As we follow the CD+NAG curves (blue and green) in Figure 1ab, we observe that increasing the mini-batch size initially decreases the number of iterations needed, until a certain point. This is the point at which the benefit of momentum acceleration saturates (i.e., we couldn't hope for a faster convergence even with full batch). If we keep increasing the mini-batch size, then there is always a choice of momentum parameter β that will keep the iteration count flat (i.e., maintain the saturated convergence rate), but now this parameter depends on the condition number κ of the problem. Concretely, our theory shows that we need β≈1−min(m,κ)1. So for m>κ (after saturation) the simple choice of β=1−m1 is suboptimal, which is why the blue line starts going up. To avoid parameter tuning, we design an adaptive scheme for estimating the correct β. With this scheme, iterations stay nearly flat even after saturation.