- Rating
- 4
- Clarity
- 3
- Confidence
- 4
- Originality
- 3
- Quality
- 3
- Significance
- 2
Read review
Summary
This paper addresses the challenge of efficiently managing resources in agentic workflows, aiming to maximize the probability of completing successfully within a specified budget and deadline. The authors propose Monte Carlo Portfolio Planning (MCPP), which looks ahead via workflow execution simulations to estimate completion probabilities at intermediate steps and adjusts the plan based on outcomes. The authors implement MCPP and evaluate it on CodeFlow and ProofFlow benchmarks, demonstrating improvements over state-of-the-art baselines. They also evaluate their method's robustness under noisy estimates.
Strengths and weaknesses
Strengths
S1. Important problem for agentic workflow resource management
S2. MCPP is an clever approach for this use case
Weaknesses
W1. Structure rigidity limits generalizability
W2. Limited discussion of computational overhead of MCPP
W3. Questionable scalability
Detailed review
S1. Thank you for your submission! I enjoyed reading the paper and appreciate the focus on going beyond average accuracy and the cost-benefit frontier. I think this is clearly an important and timely area to work on.
S2. I find the framing as a finite-horizon stochastic allocation task, where the probability of completion is the only metric that truly matters, to be quite interesting. Monte Carlo simulations seem like a good fit for this problem and are worth exploring.
W1. The paper clearly mentions that it focuses on structured workflows. However, in the real world, agents often design their own steps (ReAct-style). This should be better explored, even at the level of a conceptual sketch of how the proposed MCPP approach could generalize to open-ended agents or if the dependency graph is not known at the start. Alternatively, if this is not done, I would expect several claims and discussions to be explicitly scoped, rather than stated unconstrained in the paper.
W2. The planner overhead is really critical to evaluate the method you proposed, and it feels a little unfortunate to have the key results pushed to the appendix. However, beyond the presentation issue, I would be more concerned about planner overhead at both ends of the spectrum rather than the average case. For very short workflows, I worry that the time spent running Monte Carlo simulations would eat into the deadline much more than the subtasks themselves. And on the other end of the spectrum, for very large workflows, I would be concerned about the resource overhead of running all these simulations. Neither of these cases are evaluated.
W3. While the authors acknowledge scalability as a possible limitation, the paper is not really addressing the problem of state-space explosion, even at a conceptual level. In this scenario, workflows would be too complex or too large, and the simulation space would not realistically allow for lightweight online planning. For example, it would be good to understand whether hybrid approaches, or even approaches that include an offline planning component, would be feasible.
(Minor) While this is not a claimed contribution, I still struggle to be convinced that the Monte Carlo simulations accurately reflect real-world execution dynamics, especially in terms of model behavior or dependencies between subtasks. This also joins the problem of obtaining realistic estimates in settings where output length, test complexity, and runtime are unknown and often heavy-tailed. The noise evaluation helps, but it still feels a little hand-wavy.
Questions
Q1. What happens when the remaining budget of time is insufficient? Is there a fallback?
Q2. What additional steps could be taken to ensure that the Monte Carlo simulations accurately reflect real-world execution dynamics, especially in terms of model behavior and subtask dependencies?
Q3. What about overhead at the two ends of the spectrum? (see main review body for details)
Q4. How would you extend your design to support less structured or more open-ended workflows?
Limitations
Yes
Paper formatting concerns
No particular concerns.
Final justification
This is a good paper that should be accepted. Although certain aspects highlighted in my and other reviews are borderline, the authors did a good job with the rebuttal. I would advise incorporating as much of our feedback as possible into the revised version of the paper.
Dear Reviewer KcbT, we sincerely appreciate your thoughtful review and recognition of the importance of resource management for agentic workflows. Your questions on generality, overhead, scalability, and execution fidelity have helped clarify MCPP's scope and practical implications. Below, we respond point by point and will incorporate these clarifications and results into the revision.
W1 & Q4: About extension to open-ended workflows
We thank the reviewer for highlighting this boundary. MCPP separates workflow construction from resource allocation: it receives a fixed DAG (lines 138–149), and its current guarantees apply only to this setting. Due to the space limit, we respectfully refer the reviewer to Reviewer VZgW (W4 & Q2 & Q4) for our fuller discussion of this shared concern. Briefly, ReAct-style agents could use segment-wise planning: an orchestrator constructs the currently known subworkflow, MCPP allocates resources under the remaining budget and time, and the orchestrator updates the workflow based on observed outcomes before MCPP replans. This provides an integration path but does not optimize the unknown full workflow; native planning over evolving topology requires state augmentation and new analysis. We will scope our claims accordingly and add this extension sketch.
W2 & Q3: About planner overhead at both ends of the workflow spectrum
We thank the reviewer for emphasizing that average overhead may conceal behavior at the two extremes. In the submitted evaluation, the deadline included workflow-execution time, while MCPP planning time was measured and reported separately. We agree that end-to-end deadline accounting should include both. We therefore reran all budget–deadline settings while deducting the measured duration of every planning call from the remaining time before executing the corresponding action. Due to the space limit, we respectfully refer the reviewer to Reviewer VZgW (W2 & Q3) for the complete results and the clarification that Table 2 reports per-call CodeFlow planning time whereas Table 3 reports cumulative planning time over a complete ProofFlow workflow. Briefly, charging planning time changes CodeFlow results by at most 0.1 pp and ProofFlow results with D≥5 minutes by at most 0.7 pp; only the most deadline-sensitive D=1-minute ProofFlow setting shows a larger 2.0–3.7-pp decrease.
To examine structural scaling at the other end under the default M=64, we stratify cumulative overhead by the available DAG-size groups; each entry averages all 21 evaluated budget–deadline settings for that group. These CPU-only simulations require no additional LLM calls or GPU inference.
Planning overhead across evaluated DAG sizes
Within the evaluated range, cumulative planning time accounts for approximately 0.45% of model execution time for 4–6-node ProofFlow workflows, 1.87% for 10–12-node ProofFlow workflows, and 0.21% for 1–3-node CodeFlow workflows. These results quantify the increase in overhead across the benchmark’s observed size range, but do not establish scalability to ultra-large DAGs or ultra-short wall-clock workflows. Because Monte Carlo evaluations of candidate-action–continuation pairs are independent, they are naturally parallelizable across CPU workers; structure-aware candidate pruning and hierarchical planning are further possible extensions for substantially larger workflows. We will move this analysis into the main text, charge planning time against deadlines, and clarify per-call versus cumulative timing and the measured scope.
W3: About action-space scalability and hybrid offline–online planning
We thank the reviewer for this insightful question. Although MCPP avoids enumerating the Bellman state space, its current-action space still grows combinatorially. Our implementation already addresses this through capped candidate construction, but these details were omitted from the submission.
Let q=∣M∣∣K∣ and r=∣R(S)∣. Full enumeration gives qr actions; evaluating each under q continuation policies with Nsim simulations yields a per-decision workload of
qr+1Nsim.
The bottleneck is therefore the maximum ready-set width w=maxS∣R(S)∣. For r≤3, we retain all qr actions. For r>3, three randomly selected ready nodes vary independently while the others share same model–width assignments:
\leq \begin{cases} q^r, & r\leq3;\\ q^4, & r>3. \end{cases}$$ For $r>3$, the workload is at most $q^5N_{\mathrm{sim}}$ and no longer grows with $r$. All full base-policy actions remain included, preserving the candidate-coverage condition for state-wise safe improvement over the base-policy portfolio; pruning loss is captured by $\eta(s)$ (Corollaries 7–8). The CPU-only simulations are independent and parallelizable. A hybrid design is also feasible: offline processing can cache or rank candidates, decompositions, or coarse values, while online MCPP performs final portfolio-rollout evaluation. Retaining all full base-policy actions preserves the state-wise guarantee; replacing Monte Carlo values with learned values requires additional approximation-error analysis. We will document this complexity and candidate construction in the revision. ## Q1: About the fallback under insufficient remaining resources Yes. MCPP has an explicit fallback when no feasible candidate action remains. At each state $s=(S,b,h)$, it constructs the feasible candidate set $\widetilde{\mathcal A}_{\mathrm{feas}}(s)=\lbrace a\in\widetilde{\mathcal A}(s)\mid C(a)\leq b,\Delta(a)\leq h\rbrace$. If this set is empty, MCPP immediately returns **FAILURE** (Algorithm 1, lines 6–8), indicating that no action in the evaluated candidate set can be executed within the remaining budget and time. Otherwise, MCPP evaluates only feasible actions, executes the one with the highest estimated constrained completion probability, updates the remaining resources, and replans after observing the outcome. Beyond this runtime fallback, MCPP can also provide an ex-ante probabilistic assessment under a given budget–deadline setting. For any specified budget $B$ and deadline $D$, the same Monte Carlo mechanism can estimate the full closed-loop constrained completion probability $\widehat P_{\mathrm{succ}}$ (Appendix B.6, lines 625–635). Comparing these estimates across alternative $(B,D)$ settings can identify low-success configurations and guide resource adjustment before execution. ## Minor & Q2: About whether Monte Carlo simulations faithfully model real execution dynamics We agree that Monte Carlo estimates are only as faithful as the execution model on which they are based. To eliminate profile–evaluation reuse, we reran MCPP with three random 256/256 splits of each 512-rollout model–subtask pool. Within each split, the profiling and evaluation halves are strictly disjoint: MCPP constructs its success-rate and length profiles exclusively from the profiling half, while execution outcomes, token lengths, and latencies are sampled exclusively from the held-out half. MCPP-Split reports the mean constrained completion probability (%) across the three splits; MCPP denotes the original full-pool result. ### Held-out profile-split results on ProofFlow |Budget|Method|D=1 min|D=5 min|D=10 min|D=15 min|D=30 min|D=60 min|D=120 min| |---|---|---:|---:|---:|---:|---:|---:|---:| |B=\$0.05|MCPP|20.5|59.0|63.3|64.5|64.6|64.6|64.6| ||MCPP-Split|20.0|58.7|63.3|64.1|64.3|64.3|64.3| |B=\$1|MCPP|20.6|65.8|79.7|82.8|85.7|86.6|86.6| ||MCPP-Split|20.1|64.7|79.3|82.7|85.6|86.3|86.5| |B=\$20|MCPP|20.6|65.8|81.0|84.7|92.5|95.0|96.4| ||MCPP-Split|20.1|64.9|80.5|84.2|89.6|91.0|91.7| ### Held-out profile-split results on CodeFlow |Budget|Method|D=1 min|D=5 min|D=10 min|D=15 min|D=30 min|D=60 min|D=120 min| |---|---|---:|---:|---:|---:|---:|---:|---:| |B=\$0.05|MCPP|35.4|50.4|55.5|58.2|60.1|60.8|60.8| ||MCPP-Split|34.1|48.4|53.8|56.4|58.7|59.1|59.1| |B=\$1|MCPP|35.4|54.8|65.6|71.8|78.8|83.3|85.2| ||MCPP-Split|34.1|52.3|62.7|68.2|75.4|79.7|81.7| |B=\$20|MCPP|35.4|54.8|66.6|73.8|82.4|89.6|93.4| ||MCPP-Split|34.1|52.3|63.3|69.8|78.2|84.8|87.9| On ProofFlow, the split-based results remain within 1.1 pp of the original results for budgets up to \\$1, with the largest displayed difference of 4.7 pp at B=\$20 and D=120 min. On CodeFlow, the differences are 1.3–5.5 pp. Thus, the overall trends are preserved under strictly held-out profiling and execution, showing that the results are not an artifact of profile–evaluation reuse. This validation addresses sample reuse and finite-sample profile estimation, but not all forms of model misspecification. Held-out execution samples preserve the empirical variability and tail events represented in the collected rollout pools. The DAG captures precedence constraints between subtasks, but the current transition model assumes conditionally independent completion outcomes given the state and action; it therefore does not model output-conditioned or correlated dependencies among subtasks. Parallel execution is represented by an estimated batch-latency abstraction rather than an explicit queueing or bounded-concurrency simulator. More faithful extensions could use joint distributional profiles of success, token length, and latency during planning, condition transitions on upstream outputs or richer outcome categories, and calibrate the predicted full-workflow $\widehat P_{\mathrm{succ}}$ against held-out completion frequencies. We will include these results and clarify both the execution dynamics currently captured and the remaining assumptions in the revision.