- Rating
- 4
- Clarity
- 2
- Confidence
- 2
- Originality
- 3
- Quality
- 3
- Significance
- 3
Read review
Summary
This paper proposes GauS, a differentiable framework for operator scheduling based on Gaussian reparameterization. Instead of modeling each operator’s start time as a categorical distribution over all time steps, GauS represents it as a Gaussian variable , reducing the parameter space from to $ O(|V|)$ and better capturing the ordinal structure of time. The method formulates scheduling objectives and constraints as differentiable expectations and evaluates regular and modulo scheduling on EPFL and synthetic benchmarks.
Strengths and weaknesses
Strength
Quality: The method is technically coherent: it relaxes discrete scheduling into Gaussian variables, derives differentiable objectives/constraints, and combines them with augmented Lagrangian optimization and legalization.
Clarity: The paper clearly motivates why categorical scheduling relaxations are limited and explains the Gaussian alternative in an intuitive way. The main algorithm and formulations are relatively easy to follow.
Significance: Operator scheduling is an important problem in compilation and hardware synthesis. The proposed parameter reduction from to makes the approach potentially useful for large-scale scheduling problems.
Originality: The use of Gaussian reparameterization for differentiable scheduling is a simple but novel idea. It naturally captures temporal proximity, which categorical relaxations fail to model.
Weakness
Quality: GS-Schedule is only compared under Formulation A, so comparisons with prior differentiable methods are incomplete for the other formulations. I recommend the authors to compare their algorithms with an intuitive method that just treats all integers in the original problem as real numbers and then rounds the final output after optimization.
Clarity: The role of legalization could be explained more carefully, especially since it is invoked frequently. It is not fully clear how much final performance comes from the relaxation versus post-processing since they only gave one example for this issue. ASAP and ALAP should be explained before it appeared for a better understanding of Algorithm 1.
Originality: The main novelty is in the representation rather than the optimization algorithm. Many components, such as expected constraint penalties, augmented Lagrangian optimization, and greedy legalization, are relatively standard without theoretical justificaiton.
Questions
- Can the authors provide guarantees or bounds on feasibility and quality after rounding?
- How harmful is the independent Gaussian assumption in dense dependency graphs?
- Is it better to use distributions with more learnable parameters than Gaussian with two parameters?
Limitations
yes
Paper formatting concerns
None
Thank you for the constructive suggestions on baseline completeness, rounding guarantees, dense dependencies, compact parameterization, and presentation of legalization. We will address the weaknesses and questions below:
The original GS-Schedule comparison followed its published Form-A objective. It is very non-trivial to extend it, especially for form C: Form B is an objective extension: the predecessor-conditioned sampler continues to enforce forward dependencies locally. Form C is substantially harder because cyclic recurrences and graph-global modulo-resource capacity cannot be enforced by that local sampler; the direct categorical extension must optimize them as global soft constraints.
GS-Schedule's geometric-mean costs are 35.5% higher for Form B and 12.8% higher for Form C. More importantly, GS-schedule would fail on half of the Form C instances, indicating the inherent structual limitaiton of GS-schedule.
ASAP and ALAP are forward/backward topological timing bounds. They guide midpoint initialization, scale initialization, and regular repair, but do not constrain every gradient update. The current bounds use unit separation even in chaining mode; we will make them gap-aware or describe them as conservative heuristic windows.
Without any runtime legalization feedback, GauS still finds an exact feasible solutions in 15/15 runs and the performance only degrades by 12% on form A. We will describe the algorithm more carefully in the final version
We agree that continuous relaxation, Gaussian distributions, augmented-Lagrangian optimization, rounding, and greedy legalization are standard; we do not claim them as novel. GauS's contribution is a scheduling-specific ordinal location–scale relaxation: it replaces D separately parameterized time bins per operator with an O(∣V∣) learned representation whose location transports mass along the ordered time axis. Per-step probability is the CDF mass of the same interval used by round-to-nearest decoding, enabling one differentiable treatment of dependency, resource, liveness, and recurrence events for regular and modulo scheduling.
As a result, by improving the complexity of the algorithm and enabling the use of parallel device for scheduling problems with different formulations, we are able to match the abillity of scheduling algorithm with the growing need for large-scale modern scheduling problems.
We would also thank the reviewers for identifying the lack of theoretical characterization. Thus we added this new theoretical analysis and guarantees, and we will include it in the final version.
At a high level, our analysis addresses four properties needed to connect the continuous relaxation to a reliable discrete scheduler: whether a legal schedule can always be recovered, how closely the smooth objective tracks the rounded discrete cost, whether relaxed violations certify the probability of discrete feasibility, and what convergence can be guaranteed for the optimizer, all based on form A. These properties matter because they respectively establish a feasibility safety net, quantify relaxation and rounding error, turn the surrogate into an a posteriori certificate, and delimit when optimization guarantees are local or conditional rather than global.
For Form A with dependency gap g∈0,1 and legal stages 0,…,D−1, the dependency/deadline polytope is integral. If ℓ is the longest-path edge count, feasibility is equivalent to gℓ≤D−1, and a gap-consistent topological pass returns a feasible schedule in O(∣V∣+∣E∣). It is the componentwise-minimal forward repair above its clamped input, not a globally nearest or objective-optimal repair.
Let sˉi=round(μi) and εi=1−Pr(Si=sˉi). For a feasible rounded schedule, we derive the following Form-A relaxation bound, where C is the exact discrete objective, Cτ is its smooth surrogate, and β and α weight peak resource and edge span:
\le \sum_i\left �0� \varepsilon_i +\beta\tau\log D.$$ Moreover, $\varepsilon_i\le 2\Phi(-\gamma_i/\sigma_i)$, where $\gamma_i$ is the distance to the nearest rounding boundary. Thus the error decreases exponentially when a marginal concentrates away from a boundary. The full expected dependency violation also gives $$\Pr(S\notin\mathcal F_g)\le \widehat V_g.$$ **Proof sketch.** - **Feasibility:** the dependency matrix is node--arc incidence; box bounds preserve total unimodularity. Summing gaps along a longest path proves necessity, and longest-path labels prove sufficiency. After ASAP/ALAP clamping, topological induction proves that repair is feasible, stays below ALAP, and is componentwise minimal. - **Relaxation error:** for $E_i=\\{S_i\ne\bar s_i\\}$, a stage load changes by at most $\sum_i r_i\Pr(E_i)$. Max is 1-Lipschitz, LogSumExp adds at most $\tau\log D$, and an edge span changes by at most $D-1$ only when $E_i\cup E_j$ occurs. A union bound gives the degree term. - **Feasibility probability:** an infeasible discrete sample has at least one unit of positive violation, so Markov's inequality gives the certificate. Mean rounding is not unconditionally feasible, but regular legalization is under the conditions above. Its movement yields a computable a posteriori cost charge; no universal approximation ratio is claimed. We will align the edge-span definition and use the unmasked full violation expectation when reporting these certificates. For a fixed-multiplier gradient-descent variant, standard smoothness assumptions give an $O(1/T)$ stationarity bound; a local Polyak--Łojasiewicz condition gives linear convergence within the reached basin. These do not imply global optimality or convergence of the current Adam/restart loop. Exact Form-A optimization remains NP-hard even with no edges and two stages by reduction from PARTITION, so we claim conditional and a posteriori guarantees rather than an unconditional global-quality bound. > Q1: Can the authors provide guarantees or bounds on feasibility and quality after rounding? This question has been addressed in **W3** > Q2: How harmful is the independent Gaussian assumption in dense dependency graphs? We agree that feasible schedules are coupled by DAG dependencies and have clarified that independence is a mean-field optimization choice, not a generative claim. The global dependency, resource, and liveness losses still optimize all node parameters jointly, and the deterministic decoder rounds and exactly verifies the resulting means. Moreover, as the variances shrink, the factorized family can approach a point mass at any feasible discrete schedule, so factorization does not restrict final discrete expressivity; it only approximates joint-event surrogates at finite variance. We tested this directly with a learned rank-1/rank-4 Gaussian factor model that preserves every per-node marginal. Across 64 controlled graphs varying cover-edge load from 1.25 to 12, the independent/correlated exact-cost ratio at matched time is 0.9615 [0.9449, 0.9763] for rank 1 and 0.9628 [0.9460, 0.9780] for rank 4 (paired 95% bootstrap CIs). In the densest cells, where 84--92% of node pairs are comparable, both ratios are 0.9525 with upper endpoints below 1.00. The correlated arms require about 3.1x runtime and 1.7x peak memory. On all six 10k RW graphs they reproduce the same exact costs while using 1.56x runtime and about 3.7x memory. A Form-B subset, whose liveness event is more correlation-sensitive, likewise favors independence at matched time. Learned positive correlations do reduce the dependency surrogate, confirming a conservative finite-variance bias, but this correction does not improve decoded exact quality. We therefore present factorization as an empirically adequate accuracy--scalability tradeoff, not as a perfect probabilistic model of a DAG. > Q3: Is it better to use distributions with more learnable parameters than Gaussian with two parameters? Mean and standard deviation are a deliberate compact design: they directly control ordinal location and uncertainty while preserving $O(|V|)$ learned state. Additional distribution parameters could trade compactness and optimization cost for expressivity, so we do not claim that two parameters are universally optimal.