- Rating
- 5
- Clarity
- 3
- Confidence
- 3
- Originality
- 3
- Quality
- 3
- Significance
- 3
Read review
Summary
This paper proposes an Euler-Lagrange Minimization (ELM) method to predict dynamical system governed by PDE. ELM directly uses the learned continuous Lagrangian independent of the boundary conditions and discretization. The method evaluates the Euler-Lagrange residual on Hermite-interpolated space-time patches, and minimizes the residual locally via Newton iteration. Incorporating the Euler-Lagrange residual makes the method near-symplectic, and therefore improves energy conservation and robustness of the prediction.
Strengths and weaknesses
Strengths
- The framework incorporates Euler-Lagrange equations and therefore inherit important physic structure, such as symplecticity and energy conservation. This is important for accurately simulating dynamical systems on long-time horizon.
- The framework predicts dynamical systems based on learned continuous Lagrange. The task is important with fast development of methods learning Lagrange from data.
- The numerical results are promising. They show robustness on long-time horizon comparing to existing methods.
Weaknesses
- The usage of Newton iteration can be expensive. But the necessity or advantage of using Newton iteration is not clearly explained.
- Many descriptions in methodology section are not clear enough. See questions for details.
Questions
Major questions
- Is damped Newton iteration the main computational bottleneck of the method? If so, what is the necessity or advantage of using this optimizer?
Clarifications questions
- line 153-158
- what is the domain and codomain of and ? From the paper, is defined on , is defined as a linear combination of and therefore defined on , but is defined for whose domain is . What does mean if the domain of is ?
- What are the dimension of each component in equation (3)? Why does the solution exists and why is it unique? Is it because the functions are linearly independent and are distinct?
- Line 153, is ``'' chosen because depends on 4 quantities evaluated at points, and to guarantee the existence and uniqueness of the solution to equation (3)?
- Line 158, does the monomial basis refer to ? If so, where is the dependence on ? If not, what is the basis for?
- Figure 2, 4(b), what is moving-average?
Limitations
Yes
Paper formatting concerns
I do not notice any major issues in this paper with respect to violation of formatting, anonymity, etc.
Final justification
The proposed theoretical analysis provides additional justification for the proposed method beyond its strong empirical performance. I would like to raise my score to 5. I believe there remains further potential to improve the efficiency of the method and to develop stronger theoretical guarantees.
We thank the reviewer for their time and feedback, and for their close examination of the methodology. We hope our comments below will address the clarity concerns.
Is damped Newton iteration the main computational bottleneck of the method?
Yes, the damped Newton iteration (specifically the repeated construction of the Hessian) ends up being the main computational cost. While nothing in the method inherently requires a damped Newton, the resulting quadratic convergence is highly beneficial. The simplest reason is that the long-term behavior of the integrator relies on a good convergence of the integrator, and quadratic methods get closer to the true minimum than linear. Additionally, since every step slightly changes the minimum for the adjacent nodes, the larger Newton steps allow us to converge in drastically fewer iterations. The coupling also means that the Newton step must be damped slightly to prevent oscillations between iterations.
To provide numerical context: for the n=31 1D wave equation, if we use a simple gradient descent and tune the step size to the largest value that remains stable, after 25,000 steps the resulting residual (∼10−3) is still roughly an order of magnitude higher than the residual after three Newton’s steps (∼10−4). This context will be added to Appendix B.
What is the domain and codomain?
The domain and codomain of fi and q^ is X and R respectively. This is the same domain as for q, so R is used as defined.
What are the dimension of each component in equation (3)?
fi(X) is a row vector and denotes the m values taken by fi at the coordinates X, so the whole matrix is a square R4m×4m matrix. θ and Q are both R4m, as defined. Since F is chosen to be the tensor-product monomial basis, this is exactly two classical 1D Hermite interpolations, guaranteeing the existence and uniqueness of the solution. Being linearly-independent is a necessary but not sufficient condition, so the section will be updated to state this is a consequence of factoring into 1D Hermite interpolations.
To improve the clarity, we will update the paper to use the patch definitions and new Equation (3) below. Note that this is a purely notational change, the described method is identical.
X=[(t1,x1)…(tm,xm)]∈Xm
Q=[q(X)qt(X)qx(X)qtx(X)]T∈R4m.
f1(X)⋮f4m(X)∂t∂f1(X)⋮∂t∂f4m(X)∂x∂f1(X)⋮∂x∂f4m(X)∂t∂x∂2f1(X)⋮∂t∂x∂2f4m(X)Tθ=Q.
Line 153, is 4m chosen because Q depends on 4 quantities.
Yes, that is exactly why 4m is chosen.
Line 158, does the monomial basis refer to fi?
Yes, the monomial basis refers to fi and does depend on both x and t. This will be made explicit by updating the formula to {taxb∣a≤3,b≤5}.
We again thank the reviewer for noticing the ambiguity in this section and allowing us to clarify the notation. If there are any lingering questions on the notation, please let us know.
Figure 2, 4(b), what is moving-average?
By moving average, we refer to an average over a moving window across the data. For Figure 2, this is the average of the 11 points around each location, for Figure 4b this is the nearby 10s. These values are selected so that the overall trend is made clear while still displaying the underlying raw data. A line explaining this point will be added to each figure.